The Thanksgiving Week snowstorm brought only a couple of inches of snow, but that was shortly followed by sub-freezing temperatures and a windstorm with wind speeds around 70 mph. Trees were toppled all around Vashon Island, and power to the entire island was cut for almost a day and a half. In the next couple of weeks, more storms would follow with high wind, lightning and torrential rain.
Not only did Camp Sealth see extensive damage, our sister camp in Port Orchard, Camp Niwana, was hit equally hard.
- 10+ trees and large limbs came down across the camp road and Knoll House road
- Several more trees down over trails
- Damage to two sections of bulkhead in front of Village
- 17-foot rescue boat "Jack" found battered and washed up on the beach
- Two sections of floating dock broke apart
- Newly donated 25-foot Catalina sailboat sunk in 20 feet of water
- Hopsing cabin in Wrangler suffered extensive water damage from a broken sprinkler pipe - the cabin is likely a total loss and will have to be rebuilt
At Niwana, losses included:
- Many electrical lines around camp came down
- The cooks cabin next to the dining hall demolished by a tree
- Staff cabin has a hole in the roof from a tree
- One other cabin and the bridge in Happy Hollow are damaged
Most of the immediate clean-up has been taken care of (trees cleared from the roads and power restored), and insurance will cover much of the cost of repair/replacement of the camps' facilities. But much more work will need to be done before camp is ready for the 2011 spring and summer seasons. A Service Weekend has been scheduled for January 29-30 at Camp Sealth. Volunteers are needed to help clear trails, pick up debris from the road and around cabins, etc. Housing & meals are provided at no cost for service weekend volunteers.
To register for the Service Weekend, contact Nick Cirignano at 206 463 3174 or nickc@campfire-usa.org. Although most camp staff are gone for the holidays, we'll be back shortly after Christmas.






Renovation on the Milky Way Freddy is certainly long overdue, but within the next month or so, it will look like new! These toilets are patiently waiting outside in the cold for the interior to be completed, then they will be reinstalled. Our own maintenance staff, Steve and Chad, have done most of the work themselves, with a little assistance from a subcontractor to re-do the shower floors, and some demo work from our NCCC crew, Bluno. Here's a look at the inside:
Here's what's been done so far: Total demolition of the interior (except the sinks and counter), structural work on one of the walls, the walls have been repainted, new plumbing for the toilets, and new floors in the showers. Still to do: new walls and paint in the showers, new partitions for the toilet stalls, and reinstall the toilets. NCCC will be helping complete this project in the next two weeks. We hope to have renovation completed by December 30.